Project description


The developer Carlsberg Byen has built the European School for the City of Copenhagen, with bam danmark as the turnkey contractor. The school is built centrally in Carlsberg Byen between old buildings worthy of preservation, taking into account the many surrounding listed buildings and against the well-known landmark of the Elephant Gate.

The underground parking garage is constructed on two levels below ground level. Areo was responsible for the execution of the coatings on the two levels. In the first stage with shot blasting, screed with Flyt Snabb floating mortar at level 1, then coatings with Areo Cardeck ID +Membran 4 mm consisting of primer, membrane, basecoat and topcoat. On level 2, Areo Cardeck ID 3 mm is used. In the technical rooms, we applied Areo EP Coat Plus consisting of primer, topcoat and topcoat. Ramps are made with 20 mm subfloor Areo EP Mortar and a coating Areo Cardeck HD 5 mm. Finally, parking spaces and directional arrows etc. have been marked.

Carlsberg Byen Parking Facility

Delivered

Dec 2017 - Feb 2018

client

Carlsberg Byen Parking P/S

Location

Copenhagen V

Size of the project

9.450 m2
If you have a new project, you are welcome to contact us for a quote.
Areo Seamless Floors

Seamless floors

Epoxy floors

Polyurethane flooring
Acrylic flooring
Design flooring
Terrazzo flooring
worker laying subfloor

Subfloors

Foam concrete

Wear layer

Slurry mortar

Underfloor heating panels (EPS)

Design flooring
Injection Herlev Hospital

Injection

Injection

membrane being laid

Membranes

Membrane coatings

Bridge membranes

By usage

Health Sector

Car Parks

Bridges

Industry

Offices

Retail

Product sheets

+45 70 20 40 38
areo@areo.dk