Project description

Laying CEM FLYT SNABB with an average placement height of 40 mm – a fast-setting liquid mortar that is ready for use after 2 days.

Esbjerg Facade

Delivered

2018

client

K.G. Hansen & Sønner A/S

Location

Esbjerg

Size of the project

approx. 625 m2

Floor system

If you have a new project, you are welcome to contact us for a quote.
Areo Seamless Floors

Seamless floors

Epoxy floors

Polyurethane flooring
Acrylic flooring
Design flooring
Terrazzo flooring
worker laying subfloor

Subfloors

Foam concrete

Wear layer

Slurry mortar

Underfloor heating panels (EPS)

Design flooring
Injection Herlev Hospital

Injection

Injection

membrane being laid

Membranes

Membrane coatings

Bridge membranes

By usage

Health Sector

Car Parks

Bridges

Industry

Offices

Retail

Product sheets

+45 70 20 40 38
areo@areo.dk