Cement-based wearing course

wear layer

Uniform and ideal for
larger surfaces

Cement-based (screed) wear layer flooring

Cement-based (screed) wear layer flooring, with its uniform surface, is suitable for the application of floor coverings such as Areo seamless floor coverings or tiles, laminate, parquet or other standard floor coverings.

Mixing and paving is done with combined mixing and pumping machines, which can be used for both small and large jobs. By using a pumping machine, waste is minimised and by laying with a hose, the process is further streamlined. With our own pumping machine, we can lay up to 200 square meters of cement-based wearing per day.

 

Mixing ratio:

  • 280- 300 kg washed sand 0-6 mm
  • 37-38 kg Cement
  • ca 100 gr Wiking Fibre (Polypropylene Homopolymer – PPH)
  • 18-20 ltr water (from construction site)

Adaptable according to needs

Can be used for various construction projects

0

Ideal for larger surfaces

Can be walked on after a drying time of 24 hours

EPD Cement

DGNB Certification edgebanding

Why choose Areo Undergulve A/S?

With a solid experience in laying subfloors, we are able to customize and plan most efficiently. The work is carried out by trained floor installers. Therefore, you are assured that the job will be done correctly and, above all, efficiently. This makes the planning process easier in terms of when other parties involved in the project should start.

More About Cement-based wearing course

Why choose a cement-based wearing layer?

A cement-based wearing layer, with its uniform surface, is suitable for the application of floor coverings such as Areo’s seamless floor coverings or tiles, laminate, parquet or other standard floor coverings.

The advantage of cement-based wearing layers is that they can be adapted as needed. The unique mixing ratios allow the cement-based wearing layer to be used for various construction projects. Including Residential, Industrial,Commercial, Institutions,Hospitals and and much more.

Less waste and greater efficiency

The wearing course is usually laid in thicknesses from 55-60 mm and can be laid on both ground cover, insulation or as a finished floor surface. If no further surface coating is required, the cement-based wear layer, after sanding, can simply be given a topcoat.

A wear layer makes the concrete foundation even stronger and provides the base for a long-lasting and hard-wearing floor. The wear layer can be walked on after a drying time of 24 hours.

Experience and professional competence

With a solid experience in laying subfloors, we are able to customize and plan most efficiently. The work is carried out by trained floor installers.

Therefore, you are assured that the job will be done correctly and, above all, efficiently. This makes the planning process easier in terms of when other parties involved in the project should start.

wear layer subfloor
Areo Seamless Floors

Seamless floors

Epoxy floors

Polyurethane flooring
Acrylic flooring
Design flooring
Terrazzo flooring
worker laying subfloor

Subfloors

Foam concrete

Wear layer

Slurry mortar

Underfloor heating panels (EPS)

Design flooring
Injection Herlev Hospital

Injection

Injection

membrane being laid

Membranes

Membrane coatings

Bridge membranes

By usage

Health Sector

Car Parks

Bridges

Industry

Offices

Retail

Product sheets

+45 70 20 40 38
areo@areo.dk