Areo Stone
Areo Stone is a rustic epoxy floor mixed with decorative natural stone or marble. Suitable for shops, corridors or showrooms such as car showrooms. A great choice for rooms where durability and aesthetics need to go hand in hand. The material’s many possibilities can meet a wide range of expectations in terms of design and expression, creating unique floors. Areo Stone is in every way the material of choice, where epoxy is mixed with natural stone or marble. The system is available in a wide range of colors and decoupage work can be done so that mosaics and logos adorn the floor – exactly the way the customer wants them to.

Claus Holm
Mobile: +45 51 63 18 82
Email: ch@areo.dk

The material
Areo Stone epoxy flooring is mixed with decorative natural stone or marble. The system provides a thickness of between 8 and 12 mm. Natural stone is available in 3-5 mm and Glamor is available in 4-8 mm size. Noise reduction.
Characteristics
An economical epoxy floor that reduces cleaning and maintenance costs. At the same time, the system has the advantage that it can be laid on most surfaces.
Characteristics
Jointless coating
Solvent free
Waterproof
Diffusion-open coating
Easy to clean
Minimal Maintenance
Aesthetic Appearance
Non-slip
Durable
Noise reduction
antistatic
Withstands Heavy Loads
Resists High Thermal Loads
High chemical resistance
Surface
Available in several stone sizes and qualities. Natural, marble and colored stone.
Fire properties
The system is fire rated for emergency exits; a strength in environments where the floor is typically used.
Colors and shades
There is a wide range of colors that can be combined with decorative natural stone or marble. Contact us for information on standard colors. Available in many RAL colors.
Material supplier
Flowcrete Denmark
Practical info:
Please note that before laying Areo coatings, the developer must ensure that the temperature of the substrate is the same in all rooms and does not exceed 20 degrees (ideally 15-18°C). Large windows should be covered to prevent direct sunlight – this is especially true during hot summer days. All these factors – together but also individually – can potentially cause color differences in the final result. Special attention should be paid to areas with underfloor heating. The underfloor heating must be switched off min. 48 hours (new construction min. 72 hours) before starting work on a new coating.