The development is a mix between 80 social housing units and a senior cohousing community with 21 units located at Egedal Station.

It will be built as a block in a variety of shapes, heights and materials, from three to six storeys. The building is characterized by a large green opening in the facade. This is also where the name Green Gates comes from.

At Areo Undergulve, we have been commissioned to install 6,050 m2 of subfloor. Total subfloor construction is 183 mm, which is built up with 93 mm foam concrete, 25 mm EPS boards including 28 dB impact sound insulation, with heating coils fitted, and finished with 65-70 mm wear layer over heating coils.

We expect the project to be completed in the third quarter of 2021.

You can read much more about our products here: Subfloors.

Areo Seamless Floors

Seamless floors

Epoxy floors

Polyurethane flooring
Acrylic flooring
Design flooring
Terrazzo flooring
worker laying subfloor

Subfloors

Foam concrete

Wear layer

Slurry mortar

Underfloor heating panels (EPS)

Design flooring
Injection Herlev Hospital

Injection

Injection

membrane being laid

Membranes

Membrane coatings

Bridge membranes

By usage

Health Sector

Car Parks

Bridges

Industry

Offices

Retail

Product sheets

+45 70 20 40 38
areo@areo.dk